DM for help or questions
Parts required: - 2 m3 scrap posts required --- min of 20mm of length required for each post
- 2 m3 brass heat set inserts
- 1 Dedicated Firing Pin Cutting Jig --- 60%>= infill rectilinear, recommended
Instruction for assembly: 1 drill through entire body on x axis holes with drill smaller than m3, keep hole for firing pin UNTOUCHED
2 melt in heat inserts into either side for posts to screw into, clean up threads from excess melted plastic, if needed
3 with pliers, grip onto outer thread portion to screw/unscrew clamp and test fit clamping force with firing pin, do not overdo when tightening, as this is solely meant to hold the pin in specific orientation for precise Dremel work